Your EV decides the charging speed. Not the EV charger.
Nearly every EV sold in Malaysia caps its AC charging at 7 kW or 11 kW. Our home EV charger handles up to 22 kW — but we commission it at the output your car can actually draw, so you are not paying TNB for a three-phase supply that adds nothing. Tell us your model and we’ll size the box, the cable and the breaker to it.
on the same app as your home unit
DC charger we supply
and certification on every job
Every ChargeSini home EV charger install includes
- Site survey
- Free, on-site
- Wiring by
- ST Chargeman
- Protection
- RCBO + 6 mA DC
- Enclosure
- IP65 / IK10
- Connector
- Type 2 IEC 62196-2
- App
- Home + public in one
- Certificate
- Issued on handover
- Warranty
- 2 years
Will a 22 kW EV charger charge your EV any faster?
Every EV has an onboard AC charger, and it is a hard ceiling. A 22 kW EV charger feeding a car with a 7 kW onboard charger delivers 7 kW — no more. Pick your model and see the real overnight numbers before anyone quotes you for a supply upgrade.
- Usable battery
- 56.1 kWh
- Onboard AC limit
- 11.0 kW
- Energy needed
- 39.3 kWh
Worth 11 kW — but 22 kW adds nothing.
This car accepts 11.0 kW. If you already have three-phase supply, commissioning at 11 kW cuts the charge from 5h 46m to 3h 53m. Going to 22 kW saves a further zero minutes, because the car caps first.
Bar length = time taken; shorter is faster. A hatched bar means the wallbox is being throttled by the car, not the other way round. Assumes ~92% AC conversion efficiency and steady supply voltage; the last 10% tapers on most packs.
The hardware is the same. The wiring is the decision.
Our Autel and Archon home EV chargers are rated to 22 kW and can be commissioned single-phase or three-phase. Which one you want depends on your TNB supply first, and your car second.
Right for most Malaysian homes. BYD Atto 3, Dolphin Standard, Ora Good Cat, and every PHEV.
- Needs a 40 A spare way in your DB
- Adds roughly 35–40 km of range per hour
- Charges 20→90% overnight on every car listed above
- No TNB supply application at all
Worth it if you already have three-phase supply and an 11 kW car: Tesla Model 3/Y, BYD Seal, Proton e.MAS 7, Volvo EX30.
- Requires three-phase at your meter
- Roughly 55–60 km of range per hour
- Cuts a large-battery charge by about a third
- Same wallbox, different commissioning
Genuinely used by a short list — smart #1/#3, Renault Zoe, some Zeekr and Porsche variants. For everything else it is a number on a box.
- Requires three-phase plus a 32 A×3 way
- Delivers 22 kW only if the car accepts it
- Upgrading supply for it can cost more than the charger
- We will tell you when it is not worth it
Two numbers people forget to ask about
Neither of these appears on a quotation, and both change what a home charger really costs you over the years you own it.
Personal income tax relief on EV charging facility cost — purchase, installation, rental or subscription. Legislated through YA 2027. Claimable once; confirm your own eligibility with LHDN.
Roughly what 100 km costs charging at home, at about 16 kWh/100 km on a 40–57 sen/kWh domestic block under the July 2025 TNB tariff. The same 100 km on petrol is around RM 25.
What we will not quote you for
- A three-phase supply upgrade your car cannot use.
- A charger with no local spare parts or firmware support.
- An install without a Chargeman’s certificate — that is not a saving, it is an insurance problem.
- Cable sized to the quote instead of to the run.
From first message to first charge
This sequence is set by regulation, not by us — Chargeman certification and TNB notification are legally required on a fixed EV charging installation in Malaysia.
Send photos of your DB
Your distribution board and meter tell us your supply type and whether a spare way exists. Most quotes are settled from three photos.
Same dayFree on-site survey
We measure the real cable run, check earthing and the incoming main, and agree where the box goes. Fixed price is issued after this — never before.
2–4 daysWritten fixed quote
Wallbox, cable, protection, labour and certification, itemised. Valid 30 days, with no variation on install day.
24 hoursTNB application, if needed
Only for three-phase upgrades or a dedicated EV meter. We prepare and submit; TNB sets the timeline.
3–8 weeksInstall & commissioning
An ST-registered Chargeman wires it, tests earth loop impedance and RCD trip time, then commissions the unit against your own car.
4–6 hoursCertificate & app handover
You get the completion certificate, test results, and your ChargeSini app paired — home charging and 2,400+ public charging points under one account.
On the dayStraight answers
Do I need 22 kW to be future-proof?
How long does a home charge actually take?
Can I install a charger in a condominium?
Is charging from a 13 A wall socket safe?
Does the installation have to be certified?
Will home charging trip my main fuse?
Can I charge on off-peak rates?
What is the warranty?
Send three photos. Get a fixed price.
Your distribution board, your meter, and where you park. That is enough for us to tell you which home EV charger you need and roughly what it will cost — before anyone visits.
Charging times are estimates based on manufacturer onboard AC charger ratings and assume approximately 92% conversion efficiency; real sessions vary with battery temperature, state of charge and supply voltage. Verify your variant’s AC rating against its own specification sheet. Tax relief reflects legislation current at publication — confirm eligibility with LHDN. Tariff figures follow the TNB domestic schedule effective July 2025.